The project involved the full upgrade and refurbishment of all LED lighting along the Maroochydore Boulevard Bridge upgrading the end-of-life lighting infrastructure with new led lighting. Bailey and Dalton partnered with, Innovation Lighting to supply the LED lighting and Miles Plastic to design and manufacture custom weatherproof lighting enclosures. Works included the removal and decommissioning of all existing lighting from the bridge and the supply and installation of:
Stake holders such as TMR and Sunshine Coast Council were engaged to secure all relevant permits prior to commencement. Certified traffic management plans were developed and implemented to ensure the safe diversion of vehicles and pedestrians during lane closures and bridge works. Complete rewiring and upgrade all associated electrical wiring and completed full testing and commissioning, to ensure all lighting performance and electrical safety standards were met.
Miles Plastic provided custom frosted acrylic lighting lenses. Using the existing bridge lights as a template Miles Plastic re designed the lighting shrouds to provide a more robust and durable solution.
Innovative Lighting provided all the LED strip lighting for the bridge. Their 240V LED strip allowed for minimal joins prevented the use of external drivers and allowed to future cost effective future serviceability. They provided onsite support and additionally provided 150 individual custom blue strips for the project.
East Coast Traffic Control provided a certified traffic management plan in compliance with TMR and SCC permit requirements. They implemented safe and effective traffic control ensuring the safety of all Bailey and Dalton personnel onsite in addition to maintaining minimal traffic disruptions.